When will the upgrade be delivered?

    This playspace is being delivered as part of the Namatjira Park Master Plan. It is proposed that the playground will be delivered in two stages, from 2027. Scope is subject to funding.

    What guided the draft design of the playground upgrade?

     The draft design was developed based off feedback received in 2025.

    Will the existing trees be retained?

    Yes, the existing large trees will be retained.